国产精品无码免费视频二三区,最近2019中文字幕在线,99精产国品一二三产品区别,chinese中年熟妇free

Scan code consultation:
0755-2102 2109
Service
Current location: Home Service Ex Certificate
Procedure for Handling Explosion proof Certificate of GB/T3836 Standard

SINO Testing Services

| 2020-06-22|Return

In places where explosive mixtures are commonly present in industries such as coal, petroleum, chemical, textile, and grain processing, such as production, processing, storage, and transportation, if an explosion occurs, the harm is extremely great. Therefore, the equipment used and installed in such places generally requires the product to adopt suitable explosion-proof protection types and measures, pass relevant national explosion-proof standard tests, and obtain corresponding explosion-proof certificates to avoid causing explosions in the surrounding environment.

Explosion proof certificate: It is a document used to determine whether the equipment meets the requirements of explosion-proof standards, type tests, and routine tests for adaptation. The certificate can be for Ex devices or Ex components.

So, what are the requirements for applying for an explosion-proof certificate for equipment?
STS briefly introduced the procedure below.

◆ Data preparation requirements

(1) Applicant's Business License

(2) Product enterprise standards. Enterprise standards should include the name of the enterprise standard, the enterprise number, the date of publication and implementation, the basis for writing, the proposer, the drafter, the referenced documents, product specifications and models, basic parameters, explosion-proof markings, environmental conditions for use, explosion-proof related technical conditions, testing methods, inspection rules, judgment methods, product markings, packaging and transportation conditions, etc.

(3) Product user manual. The instruction manual should include the basic parameters of the product, environmental conditions for use, explosion-proof signs, product appearance, installation and use specifications, safety precautions, warning language, and other precautions related to explosion-proof.

(4) Product drawings. The drawings should include general assembly drawings, explosion-proof related component drawings, circuit schematics, printed circuit board drawings, screen printing drawings, component material lists, nameplate drawings, etc. Drawings unrelated to explosion-proof may not be provided. The explosion-proof structure and parameters should be reflected in the drawings.

(5) Model specification description, if it is a series product, there should also be a model specification description.

(6) Process documents. For example, for products with pouring and sealing structures, pouring and sealing process documents need to be provided.

(7) Battery specification sheet. For example, products containing batteries need to be provided.

(8) If components that have obtained explosion-proof certification are used in the product, the corresponding explosion-proof certification of the components must be provided.

◆ Sample preparation requirements

According to the product specifications, model series, representative products should be submitted for inspection, and the samples submitted for inspection should be consistent with the provided product drawings. The number of prototypes depends on the explosion-proof type and specifications of the product, usually 1-3 pieces. Three pieces of glass are required for glass components, three samples are required for n-type or sealed types, and at least one set of components before sealing is required for sealed types. Non metallic standard samples are required for components with non-metallic shells; If there are special dismantling structures, dismantling tools and other materials required for testing should be provided.

◆ Detection stage

The main work during the testing phase is in the testing laboratory. However, if the product testing fails and needs to be rectified, the enterprise needs to actively cooperate with the rectification to meet the requirements of explosion-proof standards.

◆ Certificate acquisition stage

(1) Upon receiving the certificate and report, the first step is to check for any errors in the information.

(2) Go online to check if the certificate number matches the paper certificate, and confirm the authenticity of the certificate.

圖片2.png




Related Recommendations
Contact us
0755-2102 2109
Add: 13F, Building C, Kangjia Guangming Technology Center, No. 288 Xingxin Road, Guangming District, Shenzhen
Follow us
版權(quán)所有:深圳中諾檢測(cè)技術(shù)有限公司  粵ICP備18004888號(hào)
服務(wù)熱線
18924609560
點(diǎn)擊這里給我發(fā)消息 在線咨詢
點(diǎn)擊這里給我發(fā)消息 在線咨詢
定边县| 七台河市| 偃师市| 阿拉善盟| 汪清县| 临邑县| 苏尼特右旗| 娱乐| 子洲县| 嘉鱼县| 汕头市| 田林县| 扎鲁特旗| 陆良县| 定安县| 古田县| 房产| 湘乡市| SHOW| 江山市| 辉南县| 沿河| 洛川县| 哈尔滨市| 中宁县| 乌拉特前旗| 社会| 四平市| 昌江| 司法| 馆陶县| 东光县| 壶关县| 红安县| 信宜市| 罗平县| 探索| 荥阳市| 巍山| 白朗县| 宜昌市|